Independent industry resource

Disposal: suitability and evidence

Confirm the final destination for material and residual outputs.

Inputs and exclusions

Describe the material and generating process. Ask the facility to confirm feedstock requirements, contamination limits and evidence needed for the actual batch.

Stages, outputs and residuals

Trace the input through the proposed operation. Identify useful outputs, residual streams and their destinations. Keep measured quantities separate from estimates.

Facility requirements

Verify the receiving site, operator and applicable scope using current official references. A general service description does not confirm acceptance of a specific material.